The mobile solutions offered by Nijhuis Saur Industries Mobile Water Solutions (NSI MWS) are designed to meet all your water treatment needs, whether to cover an on-site emergency or on a long-term contractual basis.
Our mobile units can be deployed to site at any time, for rental periods ranging from a few days to several years, and for a wide range of applications!
Here are some practical examples of the services we offer.
Emergency service
This fast and reliable service is designed to meet your critical and urgent needs in the event of an on-site plant failure or unforeseen event that threatens your continuity of operations.
- Short-term needs
- For unforeseen events
- Deployment within 4 hours of your call, subject to your location and equipment availability
Case study: Additional demineralized water to meet fluctuating demand
Company/sector
|
Oil & Gas company
|
Nationality
|
UK
|
Water requirements
|
Additional demineralized water
|
Problem
|
To find a solution flexible enough to meet fluctuating demand
|
Solution
|
Multiple MODI 15000T mobile trailers
Mobilization from the Stoke depot within 4 hours of the call
|
Customer benefits
|
- Peace of mind: maintenance and service are included
- Continuity of production
|
ReAct: guaranteed deployment within hours
ReAct is our Treated Water Security Plan.
Becoming a ReAct customer gives you the certainty that the appropriate water treatment solutions will be deployed within four hours of your call to us.
This service also provides full compliance with the ISO 22301 requirement to ensure appropriate water treatment capabilities as part of your business continuity plan.
Case study: Demineralized water for a car manufacturer
Company/sector
|
Multinational automotive maker
|
Nationality
|
UK
|
Water requirements
|
Demineralized water
|
Problem
|
A cracked cationic resin exchanger
|
Solution
|
Supply of an emergency solution:
- MORO 4×25 double pass <8µS/cm
|
Duration
|
12,000 m³ of water over a two-week period
|
Customer benefits
|
- Speed: on-site within 6 hours of the first call
- Production continuity
- Time to repair the on-site demineralization plant
|
Planned cover
This service provides you with mobile treatment units to meet specific needs:
- Planned equipment maintenance and upgrades
- Changes of feed water
- Changing trends in treated water consumption
- Asset commissioning
- Low oxygen demand
Case study: Planned intervention to alleviate water shortage issues
Company/sector
|
Petrochemicals: production of fertilizers, minerals, TiO2 and chemicals
|
Nationality
|
PL
|
Water requirements
|
Demineralized water
|
Problems
|
- The company was experiencing water shortages
- Higher levels of salinity in autumn and winter
- Insufficient production from the demineralization plant
- Excessively frequent resin regeneration
|
Solution
|
Minimize salinity levels using:
- Two MORO4x25T mobile reverse osmosis units
- 1 pre-filtration system
- Buffer tanks
- Pump skids to produce 200 m³ per hour with a better than 95% reduction in salinity
|
Customer benefits
|
- Peace of mind: NSI WMS took over system operation throughout the rental period
- No downtime as a result of water treatment issues: maximized plant output
|
Case study: Increased production of ultrapure water for the pharmaceutical industry
Company/sector
|
Multinational pharmaceutical manufacturer
|
Nationality
|
DE
|
Water requirements
|
Ultrapure water
|
Problem
|
- Higher production volumes driven by market growth
- Insufficient water treatment capacity to meet USP, Ph Eur and ultrapure water quality standards
|
Solution
|
Provision by NSI MWS of the resources needed to deliver a guaranteed supply of ultrapure water at 6 m³ per hour:
- 2 x 4000S skid-mounted units
- 1 new stainless steel pipe network
- 1 storage tank
- Booster pumps
- Pharmaceutical-grade flexible hoses
|
Duration
|
5-month contract
|
Customer benefits
|
- Flexibility: ‘Pay as you go’ contract
- Speed: installation operational in just 2 weeks
- Savings: No equipment purchase
|
Multi-year agreement
Our multi-year service offers reliable, adaptable, and cost-effective solutions to meet your long-term treated water needs for up to 7 years.
Reasons to choose this type of contract
- Limited CAPEX
- Production life cycle uncertainties
- The installation is required for less than 10 years
- You need to reduce your operating costs
- The volume of treated water you need is increasing
- You need to replace existing installations
- You need to boost plant reliability
- You need to reduce your raw water costs
Case study: Reliable, long-term leasing for an oil refinery
Company/sector
|
One of Germany's largest oil refineries
|
Nationality
|
DE
|
Water requirements
|
Stable, reliable production of demineralized water
|
Problem
|
- The need to offset condensate return quality issues
- The inability to wait for the next scheduled maintenance shutdown in three years’ time
|
Solution
|
- 2 x MOFI 3×80 pre-filtration units
- MOFI 12×18
- 1x MORO 4x25T Reverse osmosis trailer
- 1x MODA 100 degasser
- 1x MOPS 170i pump station
- 2x MODI 15000T ion exchange trailers
|
Duration
|
3 multiyear-year contract
|
Customer benefits
|
- Peace of mind: weekly service inspections by NSI MWS technicians. Quality and quantity guaranteed.
- No production downtime: Continuous operation 24/7
|
For more information, kindly contact : MWS@nijhuisindustries.com